SINOHYDRO - KSNS JV Tamakoshi V Hydroelectric Project (99.8 MW) , Tamakoshi, Dolakha
Tamakoshi V Hydroelectric Project
The Tamakoshi V HEP is located in Dolakha District of Bagmati Province. The project area is situated within Longitude 86Β°10β30β to 86Β°14β30β East and Latitude 27Β°45β00β to 27Β°49β50β North. The whole project area lies in Bigu and Gaurisankar Rural Municipality. The project is conceptualized to develop as a tandem operation project with Upper Tamakoshi HEP. The intake site / under- ground interconnection system with Upper Tamakoshi tailrace outlet is located in Gongar whereas the underground powerhouse lies at the right bank of Tamakoshi River just downstream of the Suri River confluence with Tamakoshi River
π Project: Tamakoshi-V Hydroelectric Project (99.8 MW)
π Location: Bigu and Gaurisankar Rural Municipality
π Employment Type: Fixed Term
π Salary: Negotiable based on experience)
πΉ Contract Management & Compliance
πΉ Claims & Dispute Resolution
πΉ Stakeholder Coordination
πΉ Cost & Risk Management
πΉ Documentation & Reporting
π Education:
π Work Experience:
π Technical & Legal Skills:
π© Email your application to: vacancy@odinepal.com or vacancyatodinepal@gmail.com
π Subject Line: Application for Contract Manager β Tamakoshi-V
π Include: Full name and updated CV
π’ Only shortlisted candidates will be contacted for further assessment.
π Join us in shaping Nepalβs renewable energy future!
Power Construction Corporation of China Ltd. is an equal opportunity employer committed to workplace diversity.
Apply before: May 24, 2025 12:00 am
Hydropower
Power Construction Corporation of China Ltd.
Hydropower
Power Construction Corporation of China Ltd.
Education
Castle Education Consultancy Pvt. Ltd.
Education
Castle Education Consultancy Pvt. Ltd.
Hydropower
SINOHYDRO - KSNS JV Tamakoshi V Hydroelectric Project (99.8 MW)
Hydropower
SINOHYDRO - KSNS JV Tamakoshi V Hydroelectric Project (99.8 MW)